top of page

Our Vision

Pasture Watt Systems, LLC is transforming energy sustainability with our nuclear-ready AI campus. We aim to achieve nuclear readiness for over 1.2 GW of clean energy by Q4 2027, with full SMR deployment targeted for 2032–2035, setting new industry standards in AI-powered innovation.

SMR strategy

Founded by Vahe Douglas, Pasture Watt Systems, LLC blends architectural innovation and sustainable design to create nuclear-ready infrastructure for the AI era. We're preparing sites for Small Modular Reactors (SMRs), enabling carbon-free power for hyperscale AI by leveraging advancements from NuScale, GE-Hitachi, and Rolls-Royce, with deployment timelines aligned to 2032–2035 U.S. commercial availability.

Nuclear-Ready AI Power: Pioneering SMR Integration for Clean Gigawatts by 2027

Nuclear-Ready Infrastructure: Pre-clearing sites for SMR integration, supporting Rolls-Royce, GE-Hitachi, and NuScale designs. Readiness by 2027; full deployment 2032–2035, enabling 1.2 GW+ of clean, baseload power for AI.

​

Liquid-cooled efficiency, stealth design, community integration

Timeline / Roadmap

  • Q4 2027: Nuclear readiness complete, over 1.2 GW clean energy potential.

  • 2032–2035: Full SMR deployment, powering AI innovation at scale.

90894318-5936-4199-aee7-a615b96d2271.jpg
Screenshot 2025-11-25 074535_edited.jpg

‪(424) 235-0017

Dallas County, TX, USA

 

© 2025 Pasture Watt Systems, LLC. All rights reserved

bottom of page